Jump to content

Recommended Posts

Posted

My borehole is 34m deep and 27m of steel casing as it is mostly sand.  The borehole finished was £5k.

 

Test pump hire, £350

 

Final pump and control, £1700

 

Filter system £1700, treating for iron and sediment, plus a UV filter for sterilisation.

 

All the above include vat.

Posted
3 hours ago, scottishjohn said:

bore hole is going to be 10-15k

And may block up and need redrilling.

If the supply is clean then it requires very little treatment. Ours emerges from a hillside with forest and moorland above. Even the theoretical dead sheep on the hill problem would be filtered out before the spring.

Posted
8 hours ago, JohnMo said:

My borehole is 34m deep and 27m of steel casing as it is mostly sand.  The borehole finished was £5k.

 

Test pump hire, £350

 

Final pump and control, £1700

 

Filter system £1700, treating for iron and sediment, plus a UV filter for sterilisation.

 

All the above include vat.

please supply name ofr bore hole company 

by message if you like

and how long ago was it done

Posted

Used GRC Aquatech at Insch Aberdeenshire.  Filter system was installed about 10 months ago, pump a couple months before that.

  • 2 weeks later...
Posted
On 04/07/2022 at 17:22, saveasteading said:

https://highwater.co.uk/contact

 

Nairn and Stirling. They will readily tell you if your situation is not ideal, rather than just take the money.


And will also quote you many more pounds than the above prices. The quote I got from them with no filtration was £18,000 ex VAT just for the plant. They had already charged the farmer £18,000 to drill the hole!

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...