Jump to content

Recommended Posts

Posted (edited)

We have steel ring beam sitting on piles, the top of the steel beam is around 600mm above ground level, we are having a Beam and Block floor, do we need a DPC to be laid on the steel beam for the Beam and Block to sit on.

Edited by NewToAllOfThis
Posted

I don't know the answer. Who designed it? Ideally you want a sectional drawing for this area.

 

Is it going to be a brick and block cavity wall ? Then I think there should be a cavity tray to deflect water to the outside above the ring beam to prevent water running down the inside of the cavity from sitting on top of it.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...