NewToAllOfThis Posted November 1, 2020 Posted November 1, 2020 (edited) We have steel ring beam sitting on piles, the top of the steel beam is around 600mm above ground level, we are having a Beam and Block floor, do we need a DPC to be laid on the steel beam for the Beam and Block to sit on. Edited November 1, 2020 by NewToAllOfThis
Temp Posted November 1, 2020 Posted November 1, 2020 I don't know the answer. Who designed it? Ideally you want a sectional drawing for this area. Is it going to be a brick and block cavity wall ? Then I think there should be a cavity tray to deflect water to the outside above the ring beam to prevent water running down the inside of the cavity from sitting on top of it.
Russell griffiths Posted November 1, 2020 Posted November 1, 2020 I would say no, is there any chance of water sitting on top of the steel or is it completely covered.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now