Bazh Posted April 27, 2020 Share Posted April 27, 2020 Hi, At the stage where the first fix for electrician is done and the plumber is starting the floor insulation for the underfloor heating,then the pipes for it, do i need to get in touch with them to come out to check before the screed goes down or do they come after? thanks Link to comment Share on other sites More sharing options...
nod Posted April 27, 2020 Share Posted April 27, 2020 They will do a pre plaster inspection You May be ready for that at the same time Link to comment Share on other sites More sharing options...
Bazh Posted April 27, 2020 Author Share Posted April 27, 2020 so after the screed is down then? Link to comment Share on other sites More sharing options...
nod Posted April 27, 2020 Share Posted April 27, 2020 He may want a look at the insulation before the screed goes down Though many of the private companies just want photos Link to comment Share on other sites More sharing options...
ProDave Posted April 27, 2020 Share Posted April 27, 2020 Is it different in England? My last BC inspection was when the timber frame was completed but not insulated and no non structural internal walls. I asked him what is the next inspection stage and his reply was "Completion" Link to comment Share on other sites More sharing options...
Temp Posted April 28, 2020 Share Posted April 28, 2020 It's a good idea to end all site inspections by asking the BCO/NHBC when he wants you to call him back for the next one as they all have their own idea. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now