MikeGrahamT21 Posted April 29, 2020 Share Posted April 29, 2020 You haven't got much time between now and MBC starting work to get this sub base in, 240t is a hell of a lot of material, I remember having 21t delivered and that was a lot to move, admittedly I did it by hand. Link to comment Share on other sites More sharing options...
rufusmacdoofus Posted April 29, 2020 Author Share Posted April 29, 2020 11 minutes ago, MikeGrahamT21 said: You haven't got much time between now and MBC starting work to get this sub base in, 240t is a hell of a lot of material, I remember having 21t delivered and that was a lot to move, admittedly I did it by hand. we have a 8 tonne digger, dumper, 3 tonne roller and a lot of people! it'll be fine!!! Link to comment Share on other sites More sharing options...
Oz07 Posted April 29, 2020 Share Posted April 29, 2020 I've done 18t in an afternoon by hand before Link to comment Share on other sites More sharing options...
Dan F Posted June 29, 2020 Share Posted June 29, 2020 In our case our foundation design showed 800mm sub-base below the 150mm MBC layer, but once we started digging the ground was perfect so we only went down 450mm and not 1250mm as had been suggested by MBC. Building inspector was more than happy and we saved on 180m3 muck-away and hardcore! BTW, MBC standard detail for foundations now seems to be type 2 + sharp sand rather than type 3 + fine gravel. I beleive this change is due to a change in the SE doing their foundation designs. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now