Search the Community
Showing results for tags 'fit'.
-
Hi, we are doing a bathroom Reno and the bath the boss likes and has ordered is a one piece, free standing bath and I'm worried it will be a a challenge to install because the side panel is not removable so access to drains and feet is restricted. For example, how do you adjust the feet of they are slightly out, or get the drainage connected if you can't get underneath. It's going onto a slab floor. Any advice or past experience would be appreciated. https://www.victorianplumbing.co.uk/monza-1700-x-750-curved-free-standing-corner-bath
-
Hi, does anyone know (for certain) whether retro-fitting battery storage (AC coupled) to an existing Solar PV Installation that benefits from the old FIT requires the installer of the battery to be MCS Certified so as not to compromise the FIT payments? ...or can anyone point me to where it is confirmed either way?
- 15 replies
-
- mcs
- energy storage
-
(and 6 more)
Tagged with:
-
The government seem to have given a boost to small scale battery storage, as they've announced that not only are they scrapping the FIT subsidy next year, but they are also not going to allow microgenerators to be paid anything for any electricity they export to the grid. So, if looking to fit PV, then several things become paramount. The first is to maximise self use, which may lead to the adoption of East/West arrays, or even flat arrays, more useful than South facing arrays. Secondly, not fitting a PV diverter system to heat hot water with excess generation would be daft; it becomes essential to try and use as much electricity you generate as possible, as there is no merit in giving the power companies a free subsidy with energy they don't have to pay for. Finally, with the price of battery systems dropping, this move may well swing the balance to make home storage more attractive. Losing e few pence for every unit exported to the grid effectively increases the return on any battery system. That could make all the difference in terms of cost effectiveness.
-
My PV array(s) is(are) finally commissioned, they have been on the roof since November last year! Two reasons for the delay: Mains power required in the house (Available Feb), also final second fit electrical, no extensions! Internet required!!! The installers tried setting it up at the end of March but failed! They returned last week when I was there and basically I did the commissioning work!!! (Following the instructions). I have 37 x 280W Monocrystalline panels JAM6(K)-60-280-4BB (Chinese from the supplier) each coupled to an enphase micro-inverter. These are wired via 3-phase cable (house is 3-phase) into their own breaker board, then onto the main board via an import meter. Teh array is split up 10 panels SE and 27 SW, each array has it's own breaker and there is a noise suppressor in the box also. An enphase envoy is wired in next to the breaker box and communicates with micro-inverters via powerline and the world by my Wi-Fi (on an isolated subnet). The problem was that the envoy (brains) could not communicate with the micro-inverters so the system was not coming online. The installers commissioning the system were stumped so after about an hour I went up into the attic to help, First of all connecting the system to my Wi-Fi (not the temporary BT Hub from build), then I downloaded the installer app (iPhone), they logged me on, and following the instruction on my laptop set up the array details (all micro-inverters were serial numbered) and set it to work. Remarkably all micro-inverters were detected but only 2/3 communicating (powerline problems), by this time it was past support hours so they planned to come back the next day. In the meantime my electrician came in to do some odd jobs, I explained the issue to him and he suggested that they take a power feed directly off their breaker board (behind their noise suppressor) for the envoy rather than use the socket that is on the attic ring. When the installers returned the next day, I passed on the advice which they confirmed with the enphase support people and fitted the dedicated socket, unsurprisingly all bar one reported in and that one has since done so. My array is now up and running: It can be viewed here: https://enlighten.enphaseenergy.com/pv/public_systems/yYpm1387793/overview?preview=1 I have managed over 8kW in the current garbage weather and over 40kWh on one day! As an aside I had to have an interim EPC produced before the array was commissioned to enable full FIT rate claim, the EPC will be subsequently re-assessed (with Solar) to give a final realistic figure. It is a quirk of the system (designed for retrofit not new-build) that if you commission a system without a lodged EPC, you get a FIT rate of about 10% of the current puny rate, but you cannot include Solar in your EPC until it is commissioned, so you end up doing it twice!!
- 18 replies
-
- 4
-
- fit
- micro-inverter
-
(and 1 more)
Tagged with:
-
THis morning I received confirmation that my FiT application has been processed and accepted by SSE. That has taken since January 2016.
- 4 replies
-
- fit
- feed in tariff
-
(and 3 more)
Tagged with: