Week one of this build, and the demolition guys are already driving me insane! ? The brick-debate ensues... and now broken slabs of concrete are in the mix (quite literally). Whilst they removed the metal (to weigh in), the windows and most of the timber of our former bungalow, we're left with landfill sized mounds of a broken up concrete slab (which we've lifted in order to lay another concrete slab ?) and the demo guys have said they never priced to remove this from site. They priced to demolish, level and site scrape. But not to remove the mountain of bricks and concrete which may or may not have all sorts of old brass chandeliers glinting in the sunlight. What is typical lovely self-builders? Should the demo price include removing the building rubble from site?
- 192 replies
-
- demolition
- cowboys
-
(and 2 more)
Tagged with:
-
Admins, please move thread to another area if this isn't the best area! Okay, I had contractor to come and dig up my old slab (100mm) and then proceed to remove a further 375 of soil. They then barrowed back in 150-160mm of type 1. They proceeded to compact it with their wacker which IMHO was too small for the job. But they kept going....and of course they didn't get to the required 100mm compacted level. I spoke to the contractor and he said he would be back today (early!!!) and would come back with a decent whacker that they use for roads. I thought they'd use a roller for that, not a whacker but who am I to say what's best.... Anyway, looks like the £250 retainer that I kept back wasn't enough to get him back to finish the job off. The bar steward has not showed up and is not answering my calls. Should have retained a bigger amount but I stupidly trusted the man. And the two barrows and rake they left behind aren't going to make up for things. I could be livid, but I'm fairly used to it in this country that homeowners get shafted like this. It's a way of life. Just look at the TV shows that rely on these 'cowboy' trades. And trying to take things up via the small claims court is just not worth the effort and expense. So rather than get angry about it, I'd like to channel any negative thoughts into getting the job finished. And rather than get someone else in, I'll probably tackle the 88sqm myself. The small whacker they had was clearly not up to the task of crushing the 160mm down to 100mm. Think they used a 450mm plate (83kg). What do I need to get this done? In most places I will need to go down another 40-50mm. Would this baby do the job? http://www.jewson.co.uk/tool-hire/compaction/plate-compactors/products/2530/reversible-plate-compactor-500mm/ Do-able in a day? I need to go down another 50mm as otherwise I won't get sufficient EPS under the new floor slab.And that was the whole flamin' point in going down do deep in the first place Mr R. BlXXXMAA of AXXXFXXW, you !"£%^&*()_+ !!!!!!! Can't wait to write up my review on MyBuilder...... red pen = excavation level, white marker = 100mm compaction level, red marker = top of hardcore bloody uneven too!! not really clear, but room centres are a lot higher too. Ideally I don't want to remove any hardcore and then compact and then add a bit back in, compact...... Advice, options? No replies on cowboy tactics, my gulliibility etc pls. That's another thread-starter....