  1. The battens are 33mm deep and the eggerboards going on top will be 22mm The screed is a lengthy job as it has to be transported upstairs in buckets by yours truly whilst the lad is mixing and the builder spreading ! Should be finished tomorrow though. These pictures might also assist.
    1 point
  2. Rest easy In the knowledge you’re not on your own, I’m also half way through digging and laying our foundations and I’ve also made the odd mistake, ours took a day of extra work to sort out.
    1 point
  3. Was going to ask about the lack of spreader plates. Neat job
    1 point
  4. that is a really neat job - lot of attention to detail from what I can see; I wish our frame erector had done a job half that good. Upstairs - what depth were the battens you put down and what thickness of board did you put on top of it? (I'm assuming you screeded between the battens). Looks really good so far - you must spend some time on cleaning and tidying!
    1 point