Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
  • Entries

    6
  • Comments

    11
  • Views

    4514

About this blog

This is a blog for our knock down and re-build of our retirement home.  The first 3 parts with copied comments were published on ebuild

Entries in this blog

Apologies I didn’t take many pictures of the process.   Initial Frustrations: Due to a delay in the First Floor (FF) Micro Screed, couldn’t access the house as planned (Thursday after arrival) but had to wait until the following Wednesday, I would have had the balancing complete by the Monday and had a week to do other small jobs, as it was I got the job finished, bit nothing else.   First of all I fitted the ground floor vent terminals, this involved trimming the termin
I will write about the install of my MVHR system, as this is something I have done myself (with help).  Theo house is being built by my contractor, supervised by my Architect and QS (who is the CDM).  As I am remote from the location I can only watch what happens on CCTV.  When I was last there the old house was standing and we had disconnected the services. 6 Months later, I have a new house, Weather tight shell, Windows and doors in, sarking and felt on, and tiles and PV being fitted.  I am do
It has been a while since I posted and things are progressing, so expect a flurry of posts in the next few months as things are decided before we go to contract, however I have been working on some minor detailing.  I have decided that I want to extract toilet smells directly from the pan (see JSHarris blog part 32) I have 6 toilets in the house, in 3 pairs (see the plans on blog 02-The Planning Saga) so can use 3 extract runs, one to each pair, the simple bit.  I then need to work ou
Initial post date 21 Jan 2016 The initial brief for the house was: Passivhaus standards U-value of walls of 0.1W/(m2.K) Passive slab floor with 0.1W/(m2.K) low U-values, typically 0.85 to 0.70 W/(m².K) for the entire window including the frame, Triple glazing with built in blinds. Underfloor Heating with individual room/hall/passageway controls Mechanical Heat Recovery Ventilation with demand control Ground Source Heat Pump and Solar water heating Photo Voltaic Tiles (not p
Initial post date 21 Jan 2016 Our planning application took just over 3 months, however there was a lot of work done before this. As I said previously over an extended period the plans bounced back and forth between the Architectural Technologist (AT) and myself, with the occasional face to face when I was up at the existing house. The initial submission consisted of the topographic survey and photographs I posted last time, a OS map (very out of date, but required), Application form and
Initial post date 08 Jan 2016 My plan is to knock down the existing bungalow and re-build it with a 2 story house. This blog will be a record of the journey (hopefully), I will pass on any lessons (good and bad) and also ask the wise collective for advice (some of which I may take). The first question is why? We have a perfectly functional 4/5 bedroom bungalow that my mother lives in. I own the house (having bought my sister out of her half) and I wish to build a house to retire to. I am

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.