UFH Pipe Centres - 150mm or 200mm?


Weebles

Recommended Posts

Just about to start fitting UFH pipes onto the steel mesh in our MBC slab.

Designer has used 150mm centres for the pipes.

Guys on site say that 200mm centres are sufficient.

I have ordered enough pipe for 150mm centres so there are no cost savings to be made now.

It will be a gas boiler supplying the hot water for the UFH.

Any views? 

 