Jump to content

Recommended Posts

Posted

Just after some thoughts on the above.  We are nearly at first floor level and have concluded that the proposed first floor rear windows that overlook a paddock and woodland (not visible otherwise) are too wide and we want to shrink the width from 1125 to 800 and also make the bathroom window which was 1125mm wide 800mm and full height like the other two windows.  I don't want to stop development and the net outcome is a slight reduction in the amount of glazing.   I am happy for the builders to continue as I don't see an issue and just wanted to ask whether I can submit the form and they carry on or do you have to cease construction until it's been decided?

Posted (edited)

That would like be a non-material change. Keep going and put the application in.

 

Just make sure you're ok regarding egress requirements under building control.

Edited by Conor

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...