Jonny Posted 4 hours ago Posted 4 hours ago Hi everyone, I'm currently building a garden room, it will be site office, come long term office/further accom over time. Built to be non permanent, it is on piers with a 8x2 base, 4x2 walls and 6x2 roof with 10 deg pitch. The room is around 20sqm. I thought I had cracked this insulation malarkey, but now I'm not sure. I've also already bought the materials without double-checking. For the walls, I was planning 100mm 035 mineral wool with 50mm pir internally. This would have a breather membrane externally and Proclima Intello Plus internally. For the roof, I was aiming for a warm roof with 100m PIR on the deck with 100mm mineral wool between rafters. I'm not sure, though, after seeing the attached UBAKUS calculation, which suggests a very poor drying time. Have I got the membranes in the wrong places or something else? I've attached a photo of the current state of the building - still some structural work required on it and also the Ubakus PDF printout. u-wert-berechnung (5).pdf
JohnMo Posted 4 hours ago Posted 4 hours ago 20 minutes ago, Jonny said: For the roof, I was aiming for a warm roof with 100m PIR on the deck with 100mm mineral wool between rafters Classic bad design hybrid roof - that is the cause of your issues. Either do the insulation above or below. If doing both a smaller amount below than above.
Jonny Posted 4 hours ago Author Posted 4 hours ago Thanks, did have an inkling that may be the case. I’ll try again on the calculator tomorrow with the 100mm PIR only and report back. It’s not going to have a high heating demand.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now