PSC88 Posted 4 hours ago Posted 4 hours ago Hi i have a main contractor and SE. SE has provided a package for all my steel calcs and also the construction drawings for BC. the builder is asking for working drawings for the build. The SE is stating some of these are out of the scope of his work and are the builders responsibility. an example being we have bay windows…. the builder wants a full working drawings of the bay windows how to attached to the structure and the roof etc. the SE has provided details of the load and lintels and specs and also Given a cross sectional view of the window with insulation details etc. builder saying not detailed enough need info on how to build the dormer out and link roof to structure? SE saying any builder worth there salt should be able to do this ? And the builder can use him for Clarification if unsure but it’s not his scope of work to go into such details ? Are the both correct? Is one being more pedantic than the other i?
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now