junglejim Posted 8 hours ago Posted 8 hours ago (edited) Hi, I’ve got my MVHR designs but wondering about coming up through the floors deck (above posi joists). I have one section where all of my upstairs ducts will come through as o 7 ducts each with 75mm diameter. I’m wondering whether I should cut a rectangular section and add noggins around the edges of deck or individual circular holes or something else? Thanks Edited 8 hours ago by junglejim
crispy_wafer Posted 6 hours ago Posted 6 hours ago (edited) As my MVHR unit is loft based, I constructed a small floor to ceiling cupboard in my sons room for shoes and the like. At the back of this is a 300mm*500mm void which I pass a bunch of ducts and an SVP stuffed with sound insulation as best i could. All through egger ontop of posi's. Personally I wouldn't cut each hole individually. Edit, All this is within the heated envelope of the house. Edited 6 hours ago by crispy_wafer
Oz07 Posted 1 hour ago Posted 1 hour ago 1 section. Its quite common to have a hole like this somewhere. On some sites they cut a hole 1400 by about 200 to pass plasterboard up through then nog and patch after.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now