Hi

 

just hoping the forum can help shed some light on the building regs after full approval.

 

i have full planning approved and then my architect submitted building regs.

 

I was initially given a refusal on one of the discharge conditions on materials.

 

i resubmitted materials and council provided an approval on the the materials discharging the conditions.

 

Am I now good to go? Or should the council be providing some form of building control approval on the construction drawings?

 

im not using my council for building regs im using a private company.

 

im demolitions a bungalow so have submitted a demotion notice 

 

Many thanks

 

 

Posted (edited)

BC and Planning are separate, so if the amendments you made via Planning are 'material' (my use of the word, not 'Material'), and have an effect on the B.Regs elements (The cladding changes from 12.5mm cement board and render to 100mm wood-fibre and render, say) then that would have an effect on the B. Regs side of things (Part L in this case, but feasibly another Part if the cement board acted as an anti-racking board and the WF didn't) then maybe you need a discussion with your BC body, but as you say, that's a private firm, not the council. So, as far as I am aware, 

13 hours ago, PSC88 said:

should the council be providing some form of building control approval on the construction drawings

 

No, your chosen BC body will do that.

 

Note my background is all in refurb, not new-build in terms of direct dealings with BC, but I cannot see LA BC being interested in specifics of a build being 'policed' by A.N.Other BC.

Edited by Redbeard
Posted

You have in effect contracted out of using the Local Authority building control service so they will not be issuing any documentation other than to confirm the Initial Notice from your appointed building control provider is satisfactory. That is a simple administrative process and has no reference to the design. Your chosen private company will confirm their satisfaction with building control matters, probably directly to your architect if they submitted the scheme.

Posted

I have not appointed the private building regs company yet stage I’m at 

 

1) planning appoved

2) building control and materials drawings submitted.

3) self build mortgage approved and conveyancing commenced./CIL liability form approved (self build)

4) demolition notice submitted 

5) contractor appointed and confirmed start date.

6) contractor provided info for private building control firm

7) gas/electric firms contacted to disconnect connections

 

 

am ready to break ground?

Posted

Okay got it!

 

so I’ve read it states must submit the application and drawings attest one week

before commencing work.

 

so if I submit the

drawings and commence demolition this is ok?

 

if there are any queries with drawings /calculations i

presume they will be in touch ?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...