Osman Posted 15 hours ago Posted 15 hours ago Good evening everyone, I wonder if I can get some help/thoughts on how to finish the below: I recently got a room renovated in my 1930s house, at the end of the room an extension was done sometimes in the 50s/60s, the extended part has a patio door which was recently replaced with a new bifold sitting on the outer leaf. The workman put down new joists (suspended timber floor) and the joists was run resting on the inner leaf of the masonry as in picture. Also, telescopic vents were installed under the bifold which crosses between outer and inner wall to help with subfloor ventilation. I now have the cavity to finish, so I can run the floor (chipboards/plywood bords) going all the way up to the bifold door, the workmen suggested no need for cavity closer when they did the work. I am unsure how to finish off the cavity up to the bifold to avoid cold bridging and any damp. I am concerned the plywood/chipboard in that area will build up mould. What is the best approach in this situation, all thoughts are much appreciated.
Big Jimbo Posted 5 hours ago Posted 5 hours ago You could wedge a piece of pir across the cavity. Either 50 0r 100mm if you have room. Then your ply, then your wood flooring. That is providing that your new floor joist have all been extended over the cavity to support the ply.
Redbeard Posted 4 hours ago Posted 4 hours ago 1 hour ago, Big Jimbo said: That is providing that your new floor joist have all been extended over the cavity to support the ply. Ah, there's the rub. If I am seeing pic. 2 correctly then at least 1 joist (and how many more?) does not extend across the cavity. (a 'missed trick', perhaps, as the OP says (I think) that it is a newly-laid floor). Looks as if some brickwork and floor will maybe have to be removed in order to be able to 'sister' a new oversailing piece of joist alongside. Not knowing the nature of the sub-floor (is it moist, for example?) I would not risk suggesting some sort of load-bearing/insulating fill to that cavity.
Iceverge Posted 3 hours ago Posted 3 hours ago Get some EPS200 and wedge/hammer it down until it hits something solid. Make sure you don't block any ventilation for the floor. Foam it in place with illbruck FM330. Trim the top of the EPS flush with the top of the joists. Stick the plywood to the top of the EPS with stixall or CT1. Apply masking tape to the door and floor before you do this as the foam and sealant will be hard to clean off. 3
Redbeard Posted 3 hours ago Posted 3 hours ago 13 minutes ago, Iceverge said: Get some EPS200 I don't know EPS200, so I don't know for certain whether it wouldn't 'suck' at all in adverse conditions. XPS definitely doesn't, though, AFAIK.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now