andyscotland Posted 2 hours ago Posted 2 hours ago Called out by my mother in law this weekend to no heat in her system. Discovered system was emptying as fast (faster) as the header tank could fill. After an awkward wriggle under the floor, I discovered the original "plumber" has made no attempt to crimp the connection on this elbow onto the pipe to the external drain down valve (at basically the lowest point in the system 😱) and it has evidently decided this weekend to move a bit and turn from a slow leak to a fast one. By my calc I think we've lost at least 200L of water under the floor since yesterday. God knows how much since this was done a few years ago. I do not own/have access to a press tool for this connector. I am not at all convinced I'll find a plumber willing to wriggle the extremely tight subfloor route to get to it. Any ideas? If I cut the pipe immediately above the elbow is there a compression elbow I could use instead? Pipe has no manufacturer listed afaics, printing says "005m UFH MULTILAYER PE-RT/AL/PE-RT butt-welded PIPE TYPE I 16x2.0mm T=85°C P=10bar ISO 21003 CLASS 2/10bar,5/10bar 04:31:43 10/09/2019". Argh!!! No wonder my own project is years behind schedule constantly having to fix up after "pros" elsewhere 🤬
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now