Jump to content

Recommended Posts

Posted (edited)

Plaster boarding going around a steel. The steel supports a 2.2m opening in the back wall of a 2 storey house.

Wondering whether the fire protection requirement (would it be 30 mins or 1 hour ?) can be met with a 12.5mm fireboard. ?

The problem being that the rest of the wall has already been boarded in 12.5mm, so using 15mm will create a problem with skimming the wall.

 

There is 70mm of rockwool between the 44mm studs in front of the steel and therefore immediately behind the plasterboard.

Edited by Spinny

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...