Spinny Posted July 21 Posted July 21 (edited) Plaster boarding going around a steel. The steel supports a 2.2m opening in the back wall of a 2 storey house. Wondering whether the fire protection requirement (would it be 30 mins or 1 hour ?) can be met with a 12.5mm fireboard. ? The problem being that the rest of the wall has already been boarded in 12.5mm, so using 15mm will create a problem with skimming the wall. There is 70mm of rockwool between the 44mm studs in front of the steel and therefore immediately behind the plasterboard. Edited July 21 by Spinny
Spinny Posted July 21 Author Posted July 21 Has got 15mm fireboard underneath. Got a call in with Building Control.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now