Jump to content

Recommended Posts

Posted

I’m hoping one of you will be able to help point me in the right direction -

 

the “landscaper” replaced my decking with tiles but has left a 20cm gap between the tiles and the patio door. 
 

that gap is too big as with the step over the patio doors - it’s about 35cm step in total and it’s tricky for the wee ones 

 

the “landscaper” has suggested taking the tiles all the way to the wall or filing the gap with stones. 
 

All the way to the wall will cause damp I reckon and I see that from other threads. And the stones will be dodgy when stepped on and shift dangerously underfoot (I know there’s adhesive that can be added but I’d be forever replacing it). 
 

any other ideas?  
 

a micro drainage channel? Placed it against the wall and tile between it and the wall? The hiccup is that there’s probably not 80cm down without knocking into some of the cement around the bottom of the house wall

 

thanks in advance 

Posted
1 hour ago, Andehh said:

Install a slit drain/narrow drain, and tile either side?

 

Bit like what we did with a semi flush patio. 

 

 

20250602_153057.jpg

Very nice, really like those tiles, is it an Aco drain ?

Posted
23 hours ago, David1234 said:

All the way to the wall will cause damp I reckon and I see that from other threads.

Is it a level threshold then ?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...