Jump to content

Recommended Posts

Posted (edited)

Trying to work out how to lay the hip so that wind / weather doesn’t get in where the tiles step down…. Would seem to be an advantage of using cement or maybe a combo unless I’m missing something? Image is for an example but likely to use similar. Or contemplating lead… any thoughts?

 Thanks

IMG_8251.png

Edited by junglejim
Posted

The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on.  Some are even adhesive so they stick down.

Posted (edited)
5 minutes ago, ProDave said:

The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on.  Some are even adhesive so they stick down.

Thanks yes I was wondering about the gap between that and the hip tile edge which will have a gap… probably overthinking this but keen for a neat finish.

Edited by junglejim

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...