February 9, 20251 yr Trying to work out how to lay the hip so that wind / weather doesn’t get in where the tiles step down…. Would seem to be an advantage of using cement or maybe a combo unless I’m missing something? Image is for an example but likely to use similar. Or contemplating lead… any thoughts? Thanks Edited February 9, 20251 yr by junglejim
February 9, 20251 yr The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on. Some are even adhesive so they stick down.
February 9, 20251 yr Author 5 minutes ago, ProDave said: The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on. Some are even adhesive so they stick down. Thanks yes I was wondering about the gap between that and the hip tile edge which will have a gap… probably overthinking this but keen for a neat finish. Edited February 9, 20251 yr by junglejim