junglejim Posted February 9 Posted February 9 (edited) Trying to work out how to lay the hip so that wind / weather doesn’t get in where the tiles step down…. Would seem to be an advantage of using cement or maybe a combo unless I’m missing something? Image is for an example but likely to use similar. Or contemplating lead… any thoughts? Thanks Edited February 9 by junglejim
ProDave Posted February 9 Posted February 9 The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on. Some are even adhesive so they stick down.
junglejim Posted February 9 Author Posted February 9 (edited) 5 minutes ago, ProDave said: The edges of that dry hip / ridge system are flexible and are supposed to be shaped to fill in the steps before the tiles go on. Some are even adhesive so they stick down. Thanks yes I was wondering about the gap between that and the hip tile edge which will have a gap… probably overthinking this but keen for a neat finish. Edited February 9 by junglejim
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now