Jimbo37 Posted November 30 Share Posted November 30 Hi all, a bit of a steer, please I had a block cavity house built by a contractor who did everything up to, plastering (ie excluding kitchen, painting and other latter jobs) and I'm in since June. Generally all is good, thankfully, but I do have a lot of minor cracks that mainly appear around windows and doors, strecting out to floor or ceiling. I have it on good advice that there are minor, basically drying out and settlement cracks - so I am not worried - and to drop back after 12/18 months to fill and paint them. My question - is that up to me to do, the builder or the painter (thats me anyhow)? Thanks, James Link to comment Share on other sites More sharing options...
Jimbo37 Posted December 2 Author Share Posted December 2 Anyone, please? Link to comment Share on other sites More sharing options...
joe90 Posted December 2 Share Posted December 2 Really depends on the original contract with the builder. It’s called snagging, worth trying your builder but if he won’t or says it was not included in the price then cr@ck on I guess. 1 Link to comment Share on other sites More sharing options...
Jimbo37 Posted December 2 Author Share Posted December 2 Thanks @joe90 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now