KirstyJ Posted September 14, 2024 Posted September 14, 2024 Good afternoon, please provide some help If you can. We have just fitted a large top hung Ali Window and originally packed toe heel but when pulling the window closed it was not drawing in top left corner, so wasn’t shutting square. So after reading a few forums where people advised to only pack at the bottom and side which we have now done, it’s sorted out one problem which is the gap is equal all round but not fixed the issue of closing accurately in top left corner ie square. please help we have currently packed 100mm from top, on the sides & 100mm from each edge on the bottom, handle edge. window is 1000mm wide x 1200mm deep. any advise ???
Russell griffiths Posted September 14, 2024 Posted September 14, 2024 Do you mean packed the frame in the brick work, or packed the glass in the frame. 1
joe90 Posted September 14, 2024 Posted September 14, 2024 It sounds like the frame is out of square although you may be able to adjust the hinges to allow square closure.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now