tvrulesme Posted April 16 Share Posted April 16 I'm building an extension (basically corridor) between my house and a detached garage I plan on converting. The trenches at 600mm wide leave just a small strip in the middle. Aside from the cost of concrete, is there any reason for this to be 2 trenches or could I just excavate the lot to the levels specified by BCO and fill the whole thing with concrete? Blue lines mark the inside of the trench Link to comment Share on other sites More sharing options...
kandgmitchell Posted April 17 Share Posted April 17 Don't see why not. If the local ground conditions require a 1.0m min. dig, odds are that bit in the middle will fall over anyway. Be cautious about undermining the existing foundations of the house by digging too wide where you abut though. Is that a drain bottom right? 1 Link to comment Share on other sites More sharing options...
tvrulesme Posted April 17 Author Share Posted April 17 10 minutes ago, kandgmitchell said: Don't see why not. If the local ground conditions require a 1.0m min. dig, odds are that bit in the middle will fall over anyway. Be cautious about undermining the existing foundations of the house by digging too wide where you abut though. Is that a drain bottom right? Thank you. Yes it's a drain but its temporary and will need relaying with the correct grade once concrete has been laid. Concrete will be poured to below the drain and lintel over the pipe in the blockwork 1 Link to comment Share on other sites More sharing options...
Mr Punter Posted April 17 Share Posted April 17 Doing the whole thing will be easier. Bear in mind the depth specified is from ground level, not the depth of concrete. You may be able to just put in concrete 300 deep and build up with blockwork. 1 Link to comment Share on other sites More sharing options...
tvrulesme Posted April 17 Author Share Posted April 17 Just now, Mr Punter said: Doing the whole thing will be easier. Bear in mind the depth specified is from ground level, not the depth of concrete. You may be able to just put in concrete 300 deep and build up with blockwork. Yes thank you. the yellow string line will be DPC so ground level 150mm below that. The concrete pavers on the left will eventually come out to drop the ground levels but are currently stopping too much collapse so will keep in place until after the pour. Concrete fill depth I have is ~500mm which will bring me just below the drain. Easier than putting the drain through the concrete and putting flexible joints on either side IMO Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now