Post and beam Posted March 11 Share Posted March 11 I dont want to get ahead of the BC process and i have not started any works on site as yet. Not ready for house foundations. But i have a little time and access to a 1.5 done digger. So i was wondering, if i practice by digging my 4.5 x 3 metre required soakaway and it ends up acceptable can i fill it with the required plastic crates, backfill and call the job done? Yes i know it will need an ingress channel. Thanks as always keith Link to comment Share on other sites More sharing options...
BotusBuild Posted March 11 Share Posted March 11 As long as you follow the distance and water table guidelines start practicing. Take photos along the way, and just don't fall in the hole (yourself or with the digger) Link to comment Share on other sites More sharing options...
JohnMo Posted March 11 Share Posted March 11 I checked and ours wanted photos only, but had to show a tape measure to prove size. But check with your planning officer they are all different with different expectations. Link to comment Share on other sites More sharing options...
Post and beam Posted March 11 Author Share Posted March 11 Thanks guys. Its a good excuse to learn to use a mini digger so long as i am not wasting my time with regard to BC. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now