iMCaan Posted September 10, 2022 Posted September 10, 2022 Hi We are building a new house with block and beam floors We are going with water underfloor heating with liquid screed on top on both ground and first floor. Do we plaster the ceilings/walls first and then under floor heating and liquid screed? Thanks
iMCaan Posted September 10, 2022 Author Posted September 10, 2022 (edited) Thanks nod. The only concern about plaster afterwards is that it filing on the screed floor and setting on the screed. Edited September 10, 2022 by iMCaan
nod Posted September 11, 2022 Posted September 11, 2022 6 hours ago, iMCaan said: Thanks nod. The only concern about plaster afterwards is that it filing on the screed floor and setting on the screed. It fine We used to do them all like that
Roundtuit Posted September 11, 2022 Posted September 11, 2022 9 hours ago, iMCaan said: The only concern about plaster afterwards is that it filing on the screed floor and setting on the screed. Any plaster snots on the floor will just scrape off. I'd wait until plastering is completed to sand the laitance off the screed though, assuming sanding is a requirement.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now