Is there a curing time for KORE insulated slab before laying masonry blocks on it? 

How long, roughly, should I insert into the plan for this curing time?

Posted

It doesn't help you, but when I asked the concrete team that poured my raft when my concrete would finish setting, they said 40-years :D . There's some truth in that.

Posted

Long weekend should do the trick. You'd want to keep any serious point loads off until 28 days, that's normally the design strength.