Happy Valley Posted May 7, 2022 Share Posted May 7, 2022 I've been poor at uploading pics over the last 12/13 months and we are now about 2/3 month from finishing (hopefully). So the construction is ICF on a 200mm concrete raft faced with natural stone and block work with K rend - well two rafts as one is at first floor level being built into a hill. Monopitch warm roof is GreenCoat PLX steel. Hopefully the pictures will tell the story. We live in an old quarry and are lucky enough to have great views. Flat roof annex on our current home was demolished to make way for the new build. Existing house will be sold shortly. 3 Link to comment Share on other sites More sharing options...
Happy Valley Posted May 7, 2022 Author Share Posted May 7, 2022 (edited) Couple of others I missed. The ground floor raft and the 1st layer of ICF with spurs to hold up the top raft. ICF was faced in solid block and covered in tanking slurry prior to back fill. All retaining wall ICF had 200mm concrete core and the rest of the house is 150mm core. Edited May 7, 2022 by Happy Valley Link to comment Share on other sites More sharing options...
Happy Valley Posted May 14, 2022 Author Share Posted May 14, 2022 Canopy going up this week with bespoke brackets 10 Link to comment Share on other sites More sharing options...
CalvinHobbes Posted May 15, 2022 Share Posted May 15, 2022 Looks fab, thanks for showing it. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now