Hi, I'm hoping someone can help.

 

We are having a two storey rear extension being done. Our bricklayer has done a vertical dpc on the second lift but not on the first?? 

Should the vertical dpc have been done on the first lift as well as the second? 

Posted

DPC and insulation required at the junction of the new and old wall constructions. Normally wall starter kits used or full cavity opened so that the cavities and insulation is continuous.