February 26, 20224 yr Hi folks I need to run some 5 core for future central heating controls (pumps, stats valves etc), to go in service voids. Can work out the mm2 , but not too sure what's the correct type, eg. Y Y or a round pvc. For example: https://www.cef.co.uk/catalogue/products/2002088-1-0mm-5-core-yy-control-flexible-cable-cut-length-sold-by-the-mtr https://www.cef.co.uk/catalogue/products/2326558-3185y-1-0mm-pvc-round-flexible-cable-black-50m-drum
February 26, 20224 yr Use standard 3 core and earth and runn2 of them as you will be using them on 2 way switches and smoke detectors.
Create an account or sign in to comment