Andehh Posted October 18, 2021 Share Posted October 18, 2021 Has anyone been following this? It doesn't look to be as generous as the RHI, but it is up front vs over several years! I am struggling to find details on how to claim it, what criteria though? https://www.mirror.co.uk/news/politics/homeowners-set-offered-5000-grants-25231186 Link to comment Share on other sites More sharing options...
shuff27 Posted October 18, 2021 Share Posted October 18, 2021 Need the detail. Everything I've read so far has been about grant to replace an existing gas boiler & nothing about installing an ASHP in a new build. Link to comment Share on other sites More sharing options...
Happy Valley Posted October 18, 2021 Share Posted October 18, 2021 My understanding is that you can claim for an AHSP install on new builds up until the end of March 2022. This website may assist: https://www.ofgem.gov.uk/environmental-and-social-schemes/domestic-renewable-heat-incentive-domestic-rhi/apply-or-login Link to comment Share on other sites More sharing options...
IanR Posted October 18, 2021 Share Posted October 18, 2021 (edited) More detail was due today, as part of the Heat in Buildings Strategy statement, but normal Commons business has been postponed due to the death of the Leigh-on-Sea MP. The Statement may now go ahead tomorrow. £4k for ASHP was the initial claim, but the briefing is suggesting that has been talked up to £5K. But, the pool of money is very small, again briefing suggests around 80,000 installs. If that's the case it will be gone in under 2 years and there will likely be some filtering to who it is available to. The briefings also suggests the ASHP install will be reduced to the price of a gas replacement in around 2 years, which is rubbish, but may be used to justify the low budget. Edited to add: Incentives may well be dropped for new builds since Building Regs next year will be start to level the costs of Gas v. ASHP Edited October 18, 2021 by IanR Link to comment Share on other sites More sharing options...
Bob77 Posted October 19, 2021 Share Posted October 19, 2021 I haven't been able to find whether it this grant will only be available for people swapping a gas boiler for a heat pump. I don't have a gas boiler, in fact I don't have central heating at all, just a combination of electric underfloor and electric storage heating, plus electric immersion water heater. Obviously this is very costly to run, but a grant would make switching to ASHP much more affordable. I suspect though that if I am not scrapping a boiler I won't be eligible? Link to comment Share on other sites More sharing options...
IanR Posted October 19, 2021 Share Posted October 19, 2021 (edited) 22 minutes ago, Bob77 said: I haven't been able to find whether it this grant will only be available for people swapping a gas boiler for a heat pump. I don't have a gas boiler, in fact I don't have central heating at all, just a combination of electric underfloor and electric storage heating, plus electric immersion water heater. Obviously this is very costly to run, but a grant would make switching to ASHP much more affordable. I suspect though that if I am not scrapping a boiler I won't be eligible? You'd be eligible for RHI now, if you can get the ASHP installed and commissioned before the scheme closes 30.03.2022. Otherwise you need to wait for the details of this new grant that will replace the RHI scheme in April next year. While it may not cover new builds, I would have thought it would cover your situation, but only the detail will tell. Edited October 19, 2021 by IanR Link to comment Share on other sites More sharing options...
Bob77 Posted October 19, 2021 Share Posted October 19, 2021 36 minutes ago, IanR said: You'd be eligible for RHI now, if you can get the ASHP installed and commissioned before the scheme closes 30.03.2022. Otherwise you need to wait for the details of this new grant that will replace the RHI scheme in April next year. While it may not cover new builds, I would have thought it would cover your situation, but only the detail will tell. Unfortunately that's not really going to be possible, as I want to replace the heating system as part of a more significant remodelling including an extension, and I have only just starting getting drawings done for that, so it will probably be March or April before work begins. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now