Is this quote reasonable for Boiler & UVC supply & install?


Hilldes

Recommended Posts

Got a quote from a professional for all Gas Safe and G3 work - I'll do all UFH and hot and cold feeds to bathrooms and waste.  Is this a reasonable price? I was expecting nearer £5K.

 

This is the pro scope of work [I have put in the materials costs]:

 

  1. Supply and install Worcester bosh 35kw 8000 system boiler . [Materials circa £1,400 inc VAT]
  2. Supply and install Worcester bosh flue system. [Materials circa £300 inc VAT]
  3. Supply and install Worcester bosh boiler buddy . [Materials circa £140 inc VAT for Fernox Boiler-Buddy]
  4. Supply and install 3 two port zone valves .
  5. Supply and install 300 l pressurised cylinder. [Materials assumed £1K max inc VAT]
  6. Supply and install copper pipe work and fittings .
  7. Install boiler and run new pipe work to cylinder and underfloor heating mainifolds . Run hot and colds too ends of were the client has left them by cylinder.
  8. Run new gas underground pipe to be put in too ducting . [Meter in detached garage to plant room - 8m run via existing 100mm yellow ducting. Plant room to kitchen island 6m run in existing 100mm yellow ducting]

 

Cost quoted for above supply and install is £7,800 zero rated for VAT.

 

Noting that these are excluded: 

  1. Client to supply [and install] manifolds for underfloor heating.
  2. Client to pipe underfloor heating pipe work .
  3. Client to pipe hot and colds and waste to bathrooms.

 

I've not costed all the copper pipework and sundries etc, but assuming this is no more than £500, looks like materials costs to be supplied in total will be circa £3,340 inc VAT]

 

Link to comment
Share on other sites

Just now, Hilldes said:

In Surrey @Adsibob.  It was meant to be a good price. Are you doing parts of this yourself? Mine is really just the boiler, UVC and gas supplies with me supplying and installing the rest.

I think for Surrey that isn’t too bad. I’m doing nothing. We got quoted something like £20k to replumb an entire 5 bed 3 bathroom plus a WC, new UFH everywhere (3 floors) new boiler, cylinder, buffer tank, water softener, screed on one floor, special boards on the others  etc. I can’t remember the breakdown exactly, but the elements you’ve quoted are similar or slightly less than the equivalent elements on ours. But you could always try negotiating down. I did, and was surprised how quickly figures come down sometimes.

Link to comment
Share on other sites

If the quality is there on the workmanship then that sound fine to me. 
Self builders can be a dangerous bunch wrapping themselves up with day rates and “what could I get it done for” / “how much more discount can we push this for” etc and the honest answer at that stage is buyer beware.


Paying a reasonable sum for a good job is value for money. Read some of the horror stories about poor installations and the cost of retrospective repairs and consider what you feel is important. ;) 

Link to comment
Share on other sites

8 minutes ago, Nickfromwales said:

If the quality is there on the workmanship then that sound fine to me. 
Self builders can be a dangerous bunch wrapping themselves up with day rates and “what could I get it done for” / “how much more discount can we push this for” etc and the honest answer at that stage is buyer beware.


Paying a reasonable sum for a good job is value for money. Read some of the horror stories about poor installations and the cost of retrospective repairs and consider what you feel is important. ;) 

Thanks @Nickfromwales. Good to know it’s in the right ball park. I’m happy to pay a reasonable price for a quality job.
 

I’ve asked for a split of costs labour/materials and how any days on site.
 

Out of interest, how many days work would you estimate for this job?

Link to comment
Share on other sites

48 minutes ago, Nickfromwales said:

Approximately x number of pieces of string ;)  

Definitely consistent with my experience of the building industry! Just had a delivery today off the wrong replacement for the wrong part that was delivered a month ago. Supplier has apologised (again) for making the same mistake as last time. Beggars belief!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...