Johnny Jekyll Posted April 27, 2021 Share Posted April 27, 2021 For our new build, the building inspector has asked us to provide Approved Document R details - of the in-building physical infrastructure to allow for future installation of broadband / data cables. I've been reading and understand it's a requirement for infrastructure enabling the installation of copper or fibre-optic cables or wireless devices capable of delivering broadband speeds of more than 30 Mbps. Things like access points, high speed electronic communications network, in-building physical infrastructure and network termination point. The house will be pretty high tech but we haven't got going on that stuff yet. Are there standard notes or a detail that we can put on the drawings to satisfy the building inspector's question at this stage, rather than producing a full electrical layout (which we're not ready to do yet)? Many thanks. Link to comment Share on other sites More sharing options...
Marvin Posted April 30, 2021 Share Posted April 30, 2021 I think at this stage it's only about where the duct for the cabling starts at the begining of your land nearest the public highway to where it ends at a box on your building.( This point is referred to as where demarcation happens.) Search for: PAS 2016 for info on ducting requirements in your search engine. So in the future when they want to roll out 10G, sorry, 4G or whatever they can draw a cable along the duct from the pavement to your external wall. Ask the building inspector if they only want a schematic of the duct route to demarcation point at the moment. Probably wanted to give you the heads up that you have to get a duct in. Let me know how you get on. Good luck Marvin. 1 Link to comment Share on other sites More sharing options...
Johnny Jekyll Posted May 1, 2021 Author Share Posted May 1, 2021 20 hours ago, Marvin said: I think at this stage it's only about where the duct for the cabling starts at the begining of your land nearest the public highway to where it ends at a box on your building.( This point is referred to as where demarcation happens.) Search for: PAS 2016 for info on ducting requirements in your search engine. So in the future when they want to roll out 10G, sorry, 4G or whatever they can draw a cable along the duct from the pavement to your external wall. Ask the building inspector if they only want a schematic of the duct route to demarcation point at the moment. Probably wanted to give you the heads up that you have to get a duct in. Let me know how you get on. Good luck Marvin. Excellent info thanks Marvin. I'll ask the building inspector and when I get a response I'll post back here. Link to comment Share on other sites More sharing options...
Temp Posted May 1, 2021 Share Posted May 1, 2021 Approved Document R is down here.. https://www.gov.uk/government/collections/approved-documents 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now