Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Electric supply

Featured Replies

On the application form for electric supply, they ask how many kW supply needed. They suggest 15kW suffices for a dwelling.

 

5 bedroom house, pumping chamber for foul drainage, electric vehicle charging point.

What kW would you show as the requirement?

 

  • Author

Their guidance also says 3 phase supply has maximum 69kvA

Yes 100 Amps per phase is about 23kVA so 3 phase will give a maximum of 69kVA

 

What rate are you expecting to charge your car?  and only one EV or more?

  • Author

Fast charging for EV preferred. Don't have an EV yet, but might get one hoping for savings on fuel & on installation of charger

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.