Jump to content

Plywood v chipboard for upper floors


Mr Punter

Recommended Posts

The engineer has specified 18mm ply for upper floors for this brick / block building.  I asked to change for 22mm Egger Protect chipboard.  They came back saying ply was needed for the overall stability strategy.

 

I like the Egger stuff because it stays in decent shape after exposure to the elements and it is a fair bit cheaper.

 

Are they correct or should I go back to them again?

Link to comment
Share on other sites

Ply exposed to the elements wouldn’t last long 18 mil would require 400 centres 22 cabba or similar is the flooring of choice on most I boarded ours then sheeted it with plastic It was left exposed for six weeks without any adverse effect 

Link to comment
Share on other sites

9 minutes ago, markc said:

Im assuming the ply is specified for bracing. Ply is good in tension and compression, chipboard is only good in compression

 

OK I suppose they may need the tension property.  I am not sure why though.  We always have chipboard in timber frame stuff.  Does brick and block need something more special?

Link to comment
Share on other sites

1 minute ago, Mr Punter said:

 

OK I suppose they may need the tension property.  I am not sure why though.  We always have chipboard in timber frame stuff.  Does brick and block need something more special?

Generally no, brick and block is usually pretty stable. Maybe the overall design or lack on internal walls etc. making the Arch or Eng err on the safe sade

Edited by markc
side
Link to comment
Share on other sites

23 minutes ago, Mr Punter said:

 

OK I suppose they may need the tension property.  I am not sure why though.  We always have chipboard in timber frame stuff.  Does brick and block need something more special?

It’s probably worth  counter battening the underside for plaster boarding This will also stop any twisting and will help stop floorboard creek later 

  • Thanks 1
Link to comment
Share on other sites

25 minutes ago, nod said:

It’s probably worth  counter battening the underside for plaster boarding This will also stop any twisting and will help stop floorboard creek later 

 

No enough space.  They are nogged and will have resilient bar under.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...