Jump to content

Inspection chamber placement


Russell griffiths

Recommended Posts

When I had my foul drainage drawings done I was talking to the drainage guy and he mentioned a method he preferred and now for the life of me I cannot picture what he was talking about. 

 

What he mentioned was having the ic sort of off line so not in the main run, I just cannot picture this anybody any ideas. 

@PeterW

Link to comment
Share on other sites

Wonder if he means grouping chambers and running a main sewer line ..? Would be odd - it mirrors how a sewer actually works - but is used for multiple properties normally. 
 

Basically you bring all the pipe work from a bathroom/area into one IC then run the outlet from that into a main run with a branch connection. The main run is then a straight run with just branches joining it and has an access at one end for jetting through.  
 

Would be odd for a single house tbh

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...