PeterW Posted January 4, 2020 Share Posted January 4, 2020 14 minutes ago, Temp said: Google found NHBC.. http://nhbccampaigns.co.uk/landingpages/techzone/previous_versions/2006/Part6/section4/sitework.htm Section 6.4 yep that’s the old 2006 version of the site guide and even the 2020 has it, but that’s the NHBC standard and not the building regs which is why I’m wondering why BCO is interested unless they are NHBC BC Inspectors ..?? I know someone who used them and the guy was very inflexible on anything that wasn’t done the NHBC way. https://nhbc-standards-beta.co.uk/2020/6-superstructure-excluding-roofs/6-4-timber-and-concrete-upper-floors/6-4-19-floor-decking/ Link to comment Share on other sites More sharing options...
nod Posted January 4, 2020 Share Posted January 4, 2020 1 hour ago, Temp said: Google found NHBC.. http://nhbccampaigns.co.uk/landingpages/techzone/previous_versions/2006/Part6/section4/sitework.htm Section 6.4 I think that’s what I said originally Min 10 mil 3 is ridiculous You would leave 8 mil for a cheap laminate floor I leave 10 mil around the perimeter of a tiled floor onto a solid floor Timber will move Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now