epsilonGreedy Posted January 2, 2020 Posted January 2, 2020 (edited) I need to form a small ramp at my drive threshold. The dimentions are 18cm drop (the gradient) over a 1.5m horizontal distance, so call it a 1 in 8 slope. The width of the drive is 5m. The high end of the ramp butts up against a solid granite kerb and the low end of the threshold ramp merges into a hardcore private road. The ramp will have a decorative top covering of angular 15mm hard chippings and about 35mm deep. I cannot decide between ordering 2" clean limestone or graded MOT1 to form this ramp. I am leaning towards 2" clean in the hope that the top chipping layer will lock nicely into the larger 2" base. Edited January 2, 2020 by epsilonGreedy
Russell griffiths Posted January 2, 2020 Posted January 2, 2020 (edited) Type 1 and a whacker plate. Edited January 2, 2020 by Russell griffiths
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now