Hi All,

 

We should be pouring the 100mm concrete sub floor this week, how long should we wait before laying the 120mm PIR boards?

 

I have read / been told anything from 3 days to 2 weeks.

 

Thanks, Wozza.

 

Link to comment
Share on other sites

31 minutes ago, PeterW said:

What’s the rush ..?

 

Do you mean the oversite or are you going to put PIR then another layer of concrete ..? 

 

Should have explained better.

 

Floor make up is as follows

 

50/55mm Cemfloor liquid screed (with UFH)

DPM

120mm PIR insulation board

100mm Concrete subfloor (almost at this stage)

DPM

Sand binding

Type 1 / hardcore

 

We want to get it done as soon as possible - there is no immediate rush and the area is weather tight (apart from, a few draughts from around the boards where the windows will be fitted).

 

Thanks,

 

Wozza.

 

 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...