Hi. Please could somebody share the cost estimation spreadsheet. We are embarking on our self journey (remodel/rebuild) and I want to cost both option so that I am clear as to what can be achieved. Has anyone been to QS. Are they worth the money? The issue is they would need plans and plans would cost money and two option would cost more moneys so I want to see first I can pull of total rebuild, if not I will go down the remodel route. Would really appreciate any help you guys can provide. Thanks.
-
Hi everyone, I'm a bricklayer who's back on the trowel after several years away from the game and I must say I'm finding it tough. The physical side of it is fine (after a few hard weeks mind) but it's the information / theory side I'm finding most difficult. Even the bonding of blockwork (blockwork so far has been 80% of my work) I find a bit difficult being truthful. Has anybody had any similar experiences? How did they find it? Did you feel like I do sometimes, like your serving your time all over again? ? Would anybody recommend any literature for me to read? Also, regards to quantifying blocks - how would you do it? Lets say I was asked to build a block (440 x 215 x 100) on edge shed and they sent me the dimensions of the slab that they wanted it built on Do I just add the length and width of the proposed building, multiply this figure by 2 and then multiply that figure by how many courses high it is going? I then deduct the door and window from this figure. Now if they now wanted to change the spec of the shed to cavity work with a 100mm inner leaf, 100mm cavity and a 100mm outer leaf how would I calculate how many blocks they would need for the outer leaf? This is probably a really basic question but I just cant get me head around it! ? Genuine thanks for anybody who replies. Cheers, IR.
-
Hi, I am wondering as to what people's experiences are on the differences between what a Quantity Surveyor prices things at as opposed to what the 'real' costs for work are? I have been told repeatedly by two architects now that they 'overegg' everything. I am needing to do house renovations (we have recently bought a 1800's cottage with low attic rooms) to get my infirm parents moved in with us. Thank you.
- 54 replies
-
- qs
- quantity surveyor
-
(and 1 more)
Tagged with: