Had the 1st spray render guy out today for a quote. Our house is ICF on a 450mm high passive slab with the DPM coming out between the raft and ICF. I was originaly hoping to have the render all the way down to the ground level, but the render guy told me I needed a bead with DPM coming out. With a stop bead and render both sides it doesnt look good which i agree. He suggested brick slip or painted for the DPM down. Has anybody used anything else for ideas?