Search the Community
Showing results for tags 'metal'.
-
There's a longer backgound story to this to do with embodied carbon - but keeping it simple.... We are contemplating alternative roofing materials for our new build and need to know if/what the impact on the design of the construction of footings and structure will be if we have to use tiles over our choice of seamed metal. The metal roof covering weighs about 2 tons the tiled roof more like 22 tons. We are planning to use a timberframe construction too. Do we need beefier footings = more concrete and beefier timberframe = more timber? At this stage we'd prefer not to pay a structural engineer to actually work it all out as the design is still a bit fluid and hope we can get an idea from yourgoodselves! Comments gratefully received. thank you
-
I'm starting off this topic as it has been mentioned on this forum various time :Combined material orders. I have organsied something similar for roofing materials and since have become engaged with the roofing company as well as some door/ window manufacturer, but would not want to start being a distributor for every single item I am planning to order. I just very often get quite good offers for whole truckloads of timber or tiles and just can't make use of it as I am missing the storage. Maybe some members on here are interested in saving substantial % of their orders by ordering material early and storing it (for others) and therefore combining purchase power. I am aware of the logistics problems that arise with it as well of the warranty and payment issues. It s not for the savety/security driven builders but more for the risk-takers on here. This is not me offering to organise all of this neither saying that I got the best connections/offers but I think that a lot of members on here stumbled (by accident or not) across a great offer(e.g. Half a container of tiles, Oak flooring by the truckload or anything remotely similar) that was just too much to take by themselves. I do also think that one-off or fire sales are not suitable as you would need to react and buy quickly, making it difficult to coordinate with potential other interested parties. It could be organised via some shared platform like Airtable. Depending on amount of interest I might just start a Buildhub Airtable, but mainly want to see what opinions are like and have others input or initiative.