Hi all,
Trying to figure out the best option for ufh in our new extention incorporating existing kitchen area etc. (I’ll attach the plans)
I can’t figure out,
A: is it best to clip onto foilbacked board in between joist and biscuit screed/cover with chipboard?
B: lay routed panel boards and tile straight on top?
I don’t really like the idea of tiling straight on top of the pipe as In “B” but will I feel the benefit and will we get enough heat from option “A”?
the boiler is going into the utility, would like two zones, one for the main living space/kitchen and the other for the shower room.
it’s a mine field, any help and guidance would be much appreciated. Also any other systems/options that would work?
Best, Keith.
GROUND FLOOR.pdf
STRUCTURE 1.pdf