@Vijay I'm in a similar situation. I'll need to put L bars in the foundation to essentially link with the ICF wall concrete. How did you do it in the end?
Hi @D Walter, for the first floor Velox module, is it possible to do the standard 50mm concrete and self leveling compound on top the concrete which should make the leveling easier?