Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 04/21/21 in Blog Entries

  1. it's been a bit quiet on our blog so I thought I should update it. While we've been waiting for the groundworks to start we've been busy getting the site ready. This has included getting the new entrance to the plot created, getting the sub-base for the driveway in place and then topping it off with a layer of 6F5 as a hardstanding for the construction vehicles (after the build I can then remove the top layer to reveal the, hopefully, still in good condition sub-base to put the final layer on top of. well that's the plan at least!) and putting up the site toilet. Obviously the last job was the most important. Our new entrance to the plot is over a culvert and as it's connecting to an adopted road it had to be done by an insured contractor and so I had to fork out the cash to get it done. but they did a very good job and we're very happy with it. the culvert in situ with enough concrete on top to take the lorries and cranes for the build a nice base layer of tarmac finished, which will see us through the build when they will come back and put a nicely finished top layer on. nice sand-bagging. ? once, they'd finished the entrance we moved on to the driveway and hardstanding but, first, an observation....it's funny how things don't look as big on paper as they do in real life. that's exactly the conclusion I came to after I looked at the plans and thought "that driveway isn't that big I'll just dig it out myself and save myself a fair chunk of cash" and then went on to dig it out. it was only after I'd finished the 120m2 area did I realise how big the driveway is going to be (I swear it doesn't look that big on paper!). oh well, it's done now, at least we'll have plenty of parking. maybe I can rent it out and do a 'Park and Ride' in to the local town to recoup some of the costs. ? a big hole dug and covered in Terram (or an equivalent to be exact) 100 tonnes of beautiful primary Type-3 granite aggregate all compacted by that beast of a roller. Don't really care what everyone else thinks but I think I did a darn good job for my first driveway sub-base. Sadly it all got covered by another layer of Terram and then a load of 6F5 got dumped on top and it now looks like a building site hardstanding area (which is what it is!). here's a photo of the lovely lady of the house helping out on the roller. it was a bit cold out that day. And finally we get to the most important job, the building of the site toilet. Friends of ours got it from a local freebie site and used it for their self-build, we then dismantled it, transported it to our site, erected it, put a new roof on it and plumbed in the toilet and sink to our existing STP. we think it's a very luxurious WC for site use. it's even got a couple of windows so you can watch the work progress while you're doing your business. and that's it for this blog post. we are extremely excited as tomorrow is the day we've been waiting for and the groundworks starts in earnest. They'll be on site to set up and start digging out the big hole for the basement as the basement contractors are due to start on the 3rd May so we should start to see some real progress now! finally!! thanks for reading. ?
    2 points
  2. There has been much discussion on the short supply of materials etc on the forum, so I'm not repeating it here. Suffice to say, the progress on the house itself is best described as "hurry up and wait". The upstairs windows are all installed, the downstairs are due to go in when the scaffolding finally goes away (any day now?), and the cladding is completed as far as is possible while waiting for the MVHR and air conditioning equipment. The sewage treatment plant arrives very shortly (thankfully no shortage here) so we have taken the opportunity to find out what is in the garden in order to install the plant and dig an attenuation pond for drainage. We would also like to be able to get to the end of the garden to see what is there! The view from the road of the house illuminated by floodlights during a late evening of activity while working on the cladding. Our snowdrops seem to scale themselves to fit their surroundings. We get a good crop every year, possibly because we leave them alone. Maybe I should be wary of breeding Triffids? They aren't supposed to be on the Isle of Wight! Last year's clearance efforts are still more or less clear. The primroses have taken over somewhat, but that's far better than nettles and brambles. The stunted pear tree is finally coming good two seasons after removing the Eucalyptus that was overshadowing it. We'll get around to trimming the dead wood at the appropriate time since we missed the opportunity this year. We're hoping for more than two pears this year. The entrance to the wilderness. We are aiming to clear at least a path to the bottom of the garden established before the growing season fills the place with the usual collection of nettles, brambles, blackthorn and willow. Based on the current growth, we don't have that much time left! We have a pathway extending at least 50 metres into the garden. This took us three days with a chainsaw, a strimmer multi-tool and a lot of wheelbarrowing. The sheer amount of dead wood is really not helping the trees - they are spreading past each other and fighting for every scrap of light until the branches get so heavy they break. We are aiming to remove only the dead wood this year so the trees can grow more sensibly and we can see exactly what we have left to work with. There is still a long way to go! Now to find something to do with the 30 barrowloads of wood. Maybe some charcoal making? Unfortunately this didn't work as well as we would have liked when the bottom of the barrel perforated in the heat, and we made a lot of ash. Oh well... time for a new plan. Finally, we are getting near the bottom of the garden. Well, at least within 30 metres. I didn't know we had all these oak trees. They are a bit too close together unfortunately so I doubt they will all stay long term. We did however find two mature oaks that are nicely spaced in another part of the garden. We can't quite get to them yet because of a thicket of blackthorn in the way. That's next week's problem unless house parts start turning up.
    1 point
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...