Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 07/19/20 in Blog Entries

  1. This is only a short update because we've been taking it easy on the house so the boss and I can get some (paid) work done. Will be the school holidays soon - so slave labour will be available! I have ordered some plain and simple white UPVC soffits and facia from a local company so time to start measuring up and cutting the splines level. More work for the Alien and some string. The plumb line is made from a Lotus Elise crank pulley bolt! Hopefully the soffits and facia will be installed around the middle of next week. We have some roofing membrane on the roof. About half way there... Just the difficult half to go! My daughter wanted to see the view from the ridge, and who am I to argue? Lets not mention how utterly terrifying this is for a parent! (Even if I was up there moments before!) I have made sure she's been thoroughly chastised over even the smallest transgression when at height and while she's nearly a teenager she will still listen to me over some things. And what a view it is! This is from one of the gable "hop ups" (Why the scaffolders call them this I don't know. You'd need to be awfully tall to hop on to it.) Our neighbours visitied. This is the view from their garden. The green membrane does blend in nicely, so I believe the pale green cladding colour is the right choice. There is still some discussion about the grey window frames.
    3 points
  2. So, progress has continued and after months of walking round looking at drawings I can actually see proper rooms which is all very exciting. My necessity of carrying lip gloss everywhere has been replaced with a tape measure which is now a handbag essential! I've become almost obsessive checking sizes of rooms, window openings and that potential bathroom purchases will fit. My tape measure had that much use it finally broke! One stand out moment was the steels for the 5.5 metre Internorm doors (modelled by the wife) and the corner window. This will be the kitchen dining room and look out up to the canal so will be one of my favourite places. The inside of the bungalow looks like a group of lads have had the worst house party ever and the chimney, naff red fireplace (see previous forum post), 70s bathroom and bedroom have all gone along with some of the windows, though neither of quite made it out of the house yet so it's just piles of rubble. In the absence of a chimney we have gained an impromptu skylight with view of the wasps nest. Internorm did their technical survey earlier this week and we just need to iron out the measurements of the 'triangle bits' above the huge sliders and hopefully will have our window order placed on Tuesday. The lead times mean potentially the windows will pretty much be the last things to go in which to be isn't a bad thing, less chance they will get damaged. Here is some pics. We are spending a rainy Saturday afternoon arguing about knobs.
    1 point
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...