  1. In my last blog entry we had done the majority of first fix and were about to tackle the lighting circuits. We had intended to do this in the conventional ring and switch runs. Reading up on our options it soon became obvious this was not the best option and that running radial circuits made much more sense. A radial approach will let us install led drivers and any automation in a central area for ease of maintenance and to allow us too upgrade with wi-fi switches at some point in the future. Initially we are installing RF controlled relays with switches that look like fairly conventional switches stuck on the walls at appropriate places. There are a couple of of lighting circuits where having Shelly controlled switches will be beneficial as we can programme them to come on at sunset for a couple of hours. All has gone reasonably well, our council building controls visited and gave us a clean bill of health and said they didn’t need to come back before completion. They’ve been really good to us drawing our attention to possible problems, so getting the news was a nice vote of confidence. It’s been hard work and we’ve been on site most days, so when it came to the 14th I did little to help my cause by buying Pat a new set of overalls ? … we both had a laugh about it. Our plans were to get the plaster-boarding done by mid March, which is when the plasterer was scheduled to finish a large job. This schedule gave us plenty of time to fit service battens on the vaulted ceiling and get everything as true as we can to give us a nice flat ceiling. Not having plaster-boarded before we decided it was prudent to call in the plasterer to take a look at what we had done and point out anything we needed to do differently. So when Shaun our plasterer came on Tuesday last week and told us it all looked good and the big job he had been due to start had been delayed as the electricians had failed to come on site. Quick discussion and we decided to break our plastering into two pieces of work and start on the 25th a full three weeks before we had planned. It was an all hands to the pumps week to meet the schedule. Our house has a two story stair case in a 1.8M by 2.4M void so when working on the ceiling over the void it looks like a very long drop...a good 8 meters. The boarding above the void is in full view, so we wanted to get a nice straight line on the intersection on the apex. We set up staging in the void on the second floor. Well supported but still knee quaking. Getting the board lifter into the work area was also a problem. Just to help the wall on one side of the area was not true so getting a 2.4M board lined up and fixed true proved a bit of a mission. In the end it took four attempts and some use of packing shims to get it right. Not a good start as it had taken the best part of a day to do a comparatively small area. Our kitchen ceiling is vaulted and we had bought a board lifter and an extension arm to allow us to do it. This extension arm allows the boards to be raised to 4.6M plenty we thought. It turned out to be just 800mm less than we needed so we ended up putting the lifter on blocks to get the additional height. In the end it worked out fairly well with minimal trauma. Can’t imagine how people do it without a lifter. Progress picked up well from this point and we put up the last few sheets with a little time to spare. Plasterer arrived on schedule and got to work fast. Such a transformation.
    7 points
  2. The piling crew phoned me early on Monday morning. Can we come to site on Thursday? We're going to be done earlier than planned and we don't want to waste money on the ferry. Fair enough I think - the ferries are silly money if you're moving equipment. It left me a little problem though - the site wasn't graded to the right level and I had no piling mats. They were on my weekend list so they would be ready for Monday when I was originally expecting the piling team. So a few phone calls later and I had my stone order accelerated and had found a very speedy digger driver for a day and a half. I'm still learning the art of grading with a digger and I haven't got time to mess about. Besides, who is going to walk around with the surveying stick saying "a bit more off here!" if I don't? Job one was to complete a piece of French drain along the front third of the southern edge of the property. Due to the lack of dumper truck, we improvised a stone carrier. We skip a few steps now because I didn't have a camera for most of the grading work. The crushed tarmac arrived for most of Wednesday morning and I spread it about until it got dark. I didn't get all of it finished but there was enough flat ground to get a good start on the first few piles. This is after the first 20 tonnes arrived. There should be no surprise that it rained the previous night so I had to deploy a pump to empty the garage footprint lest it turn to a swimming pool. I spent the morning of Thursday marking out the site with a couple of decent tapes and a laser level. It should be good to 10mm or so all things considered. This is (hopefully) adequate for groundworks. The ring beam will cover the multitude of sins, I am reliably informed by the machine operators! The first pile hole being drilled. A momentus occasion - we are finally under way with the build. The plan with the piles is to auger down to 3 metres, through the reasonably clean clay to where it starts to contain a lot of chalk particles and an awful lot of water . The anti-heave sleeves will then be fitted (the most expensive toilet roll middles I've ever seen) and an end driven steel pile will be installed to approximately 8 metres. More drilling and shovelling. The team can work at quite a pace! Even an attack of super moles doesn't put the team off their game. Most of the sleeves are now installed. Little did you all know, I am secretly building a multi-story car park. The piles are ready to be hit with the large hammer on a string. Sometimes brute force is the best way. All piles installed and concreted. Oh and it rained again for a change.
    1 point
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...