Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Building work starts at last.

(0 reviews)

Tuesday was the date given and, yippee, he turned up and got started.  By the end of day, the render at the top of the gable had been removed so we could see the area that was bowed out.  We were all a bit suprised to find that the actual wall was quite sound. we thought it would be fairly loose but it wasnt and the render was sound too.  So the decision was made to only remove the top 18'' which is the main part bowed out.  The cracked render would be opened up, re-rendered and I will paint the whole wall, once everything is complete.  The edge of the roof was exposed and the tiles were removed along the edge. 

DSC_0530.JPG

The battens and felt seem okay apart from the very ends.  The first three ridge tiles are loose and will need fixing. 

 

DSC_0532.JPG

this is an unusual view of the inside of our attic - we'll not see this again after tomorrow.  You can see the pile of cement blocks with which he will build a pillar in the centre on the wall, to tie it into the outside brick wall.  And there are 4 metal ties which will tie the wall to the rafters to ensure it does not bow out again. 

DSC_0539.JPG

 

Day 2 - the gable wall has been rebuilt. the pillar in the attic has been built and metal ties added in four places. 

 

DSC_0558b.JPG

 

I think it looks really good - but then, I am no expert - any comments welcomed from more experienced persons.  By the time I arrived this morning, (day 3), the new slates were being fitted.  When I got back to the house by mid afternoon, it was all done.  the slates look super and the ridge tiles have been fixed in place.  I am a very happy bunny!xD

 

DSC_0566.JPG

 

DSC_0571.JPG

 

And this is the pillar in the attic.

DSC_0572.JPG

 

Although the garden/patio area now needs some tlc ^_^

 

DSC_0559.JPG

 

 

 

 

2 Comments

Recommended Comments

Gimp

Members

Is this from a place you have bought recently?

TheMitchells

Members

yes, the first blog post gives all the details.

 

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.