mike2016 Posted October 31, 2018 Share Posted October 31, 2018 Hi, I've two different wall build up options and conflicting advice about which is more cost effective. The first is a twin stud, cellulose fill, with aquapanel & k-rend. The second is Climawool / timber frame / outer block leaf which is slightly thinner and claimed to be cheaper. Now, I know that's light on detail but any thoughts about cost: I would assume blockwork will take longer / need scaffolding longer vs aquapanel / k-rend cost so it's about even. Thanks. Link to comment Share on other sites More sharing options...
nod Posted October 31, 2018 Share Posted October 31, 2018 You will find that the k rend is more expensive on aqua panel You will need a base coat and mesh If you are using a concrete block Not a high suction block You won’t need a base coat or mesh Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now